{"id":690,"date":"2015-04-29T09:39:34","date_gmt":"2015-04-29T07:39:34","guid":{"rendered":"http:\/\/www.ing-dannenberg.de\/?page_id=690"},"modified":"2016-05-31T13:54:14","modified_gmt":"2016-05-31T11:54:14","slug":"degussa-stockhausen-gmbh","status":"publish","type":"page","link":"https:\/\/www.ing-dannenberg.de\/en\/industrieanlagen\/degussa-stockhausen-gmbh\/","title":{"rendered":"Evonik Stockhausen GmbH"},"content":{"rendered":"<p><strong>Addition of storeys and reconstruction of production area P7<\/strong><\/p>\n<p><strong>Client: Evonik Stockhausen GmbH<\/strong><\/p>\n<p><strong>Costumer: Evonik Stockhausen GmbH<\/strong><\/p>\n<p>To expand the production in an existing building it was necessary to add an 11m storey to the existing 12.0m (total of 23m). The existing building is from the 1940s. During the whole construction phase the production was not to be interrupted. Therefore the addition was built on top first and then the existing roof was removed. The construction costs add up to approximately 1.1\u00a0m Euros.<\/p>\n<p><strong>Our performances:<\/strong><br \/>\n<strong>\u2022 Building application<\/strong><br \/>\n<strong>\u2022 Static calculations<\/strong><br \/>\n<strong>\u2022 Detailed and approved final design<\/strong><br \/>\n<strong>\u2022 Steel construction drawings<\/strong><br \/>\n<strong>\u2022 Structure planning incl. formwork and reinforcement drawings<\/strong><\/p>\n<p>[su_button url=&#8221;http:\/\/www.ing-dannenberg.de\/wp-content\/uploads\/diverses\/mappen\/evonik_stockhausen-p7_en.pdf&#8221; style=&#8221;glass&#8221; background=&#8221;#0d324c&#8221; target=&#8221;blank&#8221;]as PDF-Document&#8230;[\/su_button]<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Further Industrial Plant Projects:<\/strong><br \/>\n<a href=\"http:\/\/www.ing-dannenberg.de\/industrieanlagen\/zellstoff-stendal-gmbh\/\">Zellstoff Stendal GmbH<\/a><br \/>\n<a href=\"http:\/\/www.ing-dannenberg.de\/industrieanlagen\/deutsche-solvay-werke-gmbh\/\">German Solvay Werke GmbH<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Addition of storeys and reconstruction of production area P7 Client: Evonik Stockhausen GmbH Costumer: Evonik <a class=\"more-link\" href=\"https:\/\/www.ing-dannenberg.de\/en\/industrieanlagen\/degussa-stockhausen-gmbh\/\">Weiterlesen&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":116,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-690","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/comments?post=690"}],"version-history":[{"count":5,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/690\/revisions"}],"predecessor-version":[{"id":1448,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/690\/revisions\/1448"}],"up":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/116"}],"wp:attachment":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/media?parent=690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}