{"id":163,"date":"2015-04-01T14:57:45","date_gmt":"2015-04-01T12:57:45","guid":{"rendered":"http:\/\/www.ing-dannenberg.de\/wp-dannenberg_2015a\/?page_id=163"},"modified":"2016-09-06T18:23:42","modified_gmt":"2016-09-06T16:23:42","slug":"gewerbebau","status":"publish","type":"page","link":"https:\/\/www.ing-dannenberg.de\/en\/gewerbebau\/","title":{"rendered":"Commercial Constructions"},"content":{"rendered":"Besides longterm framework contracts with the steel and chemistry industry and participation in planning for the logistics and wood industry, we provided complete designs for commercial projects. In particular, it involved the location search, the design, the formal application processes and coordination of the construction process.<br \/>\nGenerally, commercial facilities consists of production sites, administration and social areas, loading and shipping bays as well as connection to the necessary infrastructure.<\/p>\n<p>Further information is available in the commercial project documentations below.<\/p>\n<p><strong>Our Commercial Construction Projects:<\/strong><\/p>\n<div class=\"su-accordion su-u-trim\">\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Zukunft GmbH \u2013 Erection of a warehouse and an administration building with exhibition space<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>The two-bayed warehouse with two 20\u00a0tonnes overhead travelling cranes is used for repairwork and storage of large machines.<\/p>\n<p>General Design, structural design, managing application process for building permit, static calculations, construction drawings, managing tendering process and allocations of contracts, construction supervision.<\/p>\n<p><em>Completion: September 2000<\/em><br \/>\n<em> Construction costs: 3.7\u00a0m \u20ac<\/em><br \/>\n<em> Contact: Mr. Adnan Uczak<\/em><\/p>\n<a href=\"\/gewerbebau\/lagerhalle-mit-ausstellungs-und-buerotrakt\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Holz Dammers Moers \u2013 Addition of storeys and expanison of an administration building incl. overbuilding a truck thoroughfare<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>An administration building had to be extended. The small working area and the static construction of the already existing building were particular challanges.<\/p>\n<p>General design, structural design, managing application process for building permit, static calculations, construction drawings, managing tendering process and allocations of contracts, construction supervision<\/p>\n<p><em>Completion: Juni 1999<\/em><br \/>\n<em>Construction costs: 1.5\u00a0m \u20ac<\/em><br \/>\n<em>Contact: Mr. Arnold Dammers<\/em><\/p>\n<a href=\"\/gewerbebau\/verwaltungsgebaeude-hdm-holz-dammers-moers\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Kloeckner Stahl- und Metallhandel \u2013 Erection of a warehouse and open-air storage space in Duisburg<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>Extension of the existing by two more warehouses with overhead cranes and open-air storage space. The rail connection was extended also.<\/p>\n<p>Detailed and approved final design, static calculations, formwork and reinforcement drawings<\/p>\n<p><em>Completion: 2011<\/em><br \/>\n<em>Construction costs: 2\u00a0m \u20ac<\/em><br \/>\n<em>Contact: Mr. Salomon<\/em><\/p>\n<a href=\"\/gewerbebau\/kloeckner-stahl-und-metallhandel\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>DTS Systemoberflaechen GmbH \u2013 Extension of the production area<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>The existing production was extended threefold of the already existing volume. This includes the production areas, storage and shipping halls, as well as the office and social areas.<\/p>\n<p>General planning: Design, application process, construction drawings, allocation of contracts, construction supervision<\/p>\n<p><em>Completion: 2007<\/em><br \/>\n<em>Construction costs: 2.5 m \u20ac<\/em><br \/>\n<em>Contact: Mr. Tenorth<\/em><\/p>\n<a href=\"\/gewerbebau\/dts-systemoberflaechen-gmbh\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Besides longterm framework contracts with the steel and chemistry industry and participation in planning for <a class=\"more-link\" href=\"https:\/\/www.ing-dannenberg.de\/en\/gewerbebau\/\">Weiterlesen&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-163","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/comments?post=163"}],"version-history":[{"count":13,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/163\/revisions"}],"predecessor-version":[{"id":2575,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/163\/revisions\/2575"}],"wp:attachment":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/media?parent=163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}