{"id":157,"date":"2015-04-01T14:52:24","date_gmt":"2015-04-01T12:52:24","guid":{"rendered":"http:\/\/www.ing-dannenberg.de\/wp-dannenberg_2015a\/?page_id=157"},"modified":"2016-09-06T18:20:03","modified_gmt":"2016-09-06T16:20:03","slug":"kraftwerksbau","status":"publish","type":"page","link":"https:\/\/www.ing-dannenberg.de\/en\/kraftwerksbau\/","title":{"rendered":"Power Plant Constructions"},"content":{"rendered":"A significant part of an industrial facility depends on the power supply. Therefore we have been involved in constructing thermal and electrical power generation facilities. Further, we participated in specialty power plant projects. Our main task was the co-ordination of machine and equipment installation and the building construction. According to the contract specification, we provided the manufacturing drawings and supervised the construction process.<\/p>\n<p>Further information is available in the power plant projects below.<\/p>\n<p><strong>Our Power Plant Construction Projects:<\/strong><\/p>\n<div class=\"su-accordion su-u-trim\">\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>CHP in Wuppertal - DSD Industrieanlagen GmbH<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>The CHP (combined heat and power station) was modified in the area around a former coal boiler. Therfore, two gas turbines for electric power generation with heat recovery were installed. The two kettles for heat recovery have chimneys that are 60 m high. Kettles and chimneys were placed in a new building infront of the excisting building.<\/p>\n<p>General planning: application process for building permit, construction planning, structural design incl. formwork and reinforcement drawings, steel construction drawings.<\/p>\n<p><em>Completion: end\u00a02005<\/em><br \/>\n<em> Construction costs: 4.3\u00a0m \u20ac<\/em><br \/>\n<em> Contact: Mr. Eberhard Kerfs (DSD)<\/em><\/p>\n<a href=\"\/kraftwerksbau\/dsd-industrieanlagen-gmbh-heizkraftwerk-in-wuppertal\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>MHKW Frankfurt - Baumgarte Boiler Systems GmbH<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>MHKW Frankfurt Nordweststadt, Germany:<\/p>\n<p>Controlling of steel construction engineer services<\/p>\n<p>The existing waste incineration plant was modernized with two new boiler systems, and in a second phase in 2006, two more boilers were added.<\/p>\n<p>Planning supervision for Baumgarte, coordination of mechanical and structural layout, adaptation and coordination of the static calculations with the steel construction drawings.<\/p>\n<p><em>Completion: end 2007<\/em><br \/>\n<em> Construction costs: 12.5\u00a0m \u20ac<\/em><br \/>\n<em> Contact: Mr. Ralf Senff-Wollenberg<\/em><\/p>\n<a href=\"\/kraftwerksbau\/ava-abfallverbrennungsanlage-nordweststadt-gmbh\/\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:6px 16px;font-size:13px;line-height:20px;border-color:#567082;border-radius:5px;text-shadow:none\"><i class=\"sui sui-info-circle\" style=\"font-size:13px;color:#FFFFFF\"><\/i> More infos&#8230;<\/span><\/a>\n<\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A significant part of an industrial facility depends on the power supply. Therefore we have <a class=\"more-link\" href=\"https:\/\/www.ing-dannenberg.de\/en\/kraftwerksbau\/\">Weiterlesen&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-157","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/comments?post=157"}],"version-history":[{"count":9,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/157\/revisions"}],"predecessor-version":[{"id":2295,"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/pages\/157\/revisions\/2295"}],"wp:attachment":[{"href":"https:\/\/www.ing-dannenberg.de\/en\/wp-json\/wp\/v2\/media?parent=157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}